Run three lasted 41.5 hours to mill from 6,782 to 7,557 ft (2067 to 2303 m), averaging 18.67 ft/hr (5.7 m/hr). The final run reached a total depth (TD) of 7,950 ft (2426 m) in 21.5 hours, with an average ROP of 18.67 ft/hr (5.7 m/hr). In total, the METAL MUNCHER pilot mill with AMT cutters milled 4,200 ft (1280 m) in four runs with an average
Цааш унших